Read plumbing bids for a new Lilburn home or addition stage by stage, check the fixture allowances and exclusions, and confirm who files the city's subcontractor affidavit before the first inspection.
When builders and owners collect prices for new construction plumbing, the numbers rarely line up, and the reason is usually the scope rather than the rate. One contractor includes the water heater, the yard lines and every inspection trip; another prices the pipe inside the walls and leaves the rest for later conversations. Reading a bid closely, before anyone signs, is the cheapest way to keep a Lilburn build on schedule and free of arguments.
What a complete plumbing scope lists
A useful bid walks through the job stage by stage and names what happens at each one:
- Underground: drain lines below the slab or in the crawlspace, with testing and the inspection visit.
- Rough-in and top-out: drains, vents and water lines through the framing, vents through the roof deck, tub and shower valves set, and stub-outs capped.
- Yard lines: the building sewer to the public connection and the water service from the meter, or a clear note that someone else handles them.
- Water heater: type, capacity and fuel, plus the venting, pan and drain it needs.
- Trim-out: setting fixtures, connecting appliances, starting the water heater and the final inspection.
If a stage is missing, ask whether it was forgotten or deliberately left out. Both answers matter.
Allowances and who buys the fixtures
Many bids carry a fixture allowance, a set budget for faucets, toilets and sinks, with the owner choosing models later. Allowances keep a project moving, but a low allowance can make a bid look attractive and then grow once real selections are made. The alternative is a fixture schedule priced up front. Owners who buy their own fixtures should confirm that the plumber will install owner-supplied items and who handles a part that arrives damaged or incomplete. Shower valves deserve special attention, since the valve body goes in at rough-in long before the trim is unboxed and must match the brand of that trim.
Exclusions that cause disputes later
- Trenching, backfill and concrete cutting, which may belong to the excavator or the concrete crew.
- Ice maker lines, extra hose bibs and the laundry box.
- Gas piping to the range, water heater and fireplace.
- Repairs when another trade drills or nails through finished pipe.
- Return trips for a failed or missed inspection.
None of these is unreasonable to exclude. They only become a problem when nobody noticed they were excluded.
Permits and paperwork in Lilburn
Lilburn's building and trade permit page lists plumbing systems, water heaters included, among the work that needs a permit, and it takes applications and payments online. It also sets out a step builders sometimes miss: the plumbing subcontractor files its own trade permit and a subcontractor affidavit before work starts. A bid that says who files that paperwork, and when, keeps the first inspection from being pushed back.
Water heater and water service choices belong in the bid
The water heater is one of the larger line items, and bids often differ simply because one assumes a standard tank and another a tankless water heater with its own gas sizing and venting. Settle the choice before comparing prices. The same goes for the water service: a long run from the meter, or an older service being reused on an infill lot, may need attention from a main water line crew, and a good bid says whether that line is new, reused or outside the contract.
Comparing bids side by side
Line the bids up in a simple table with each stage, the water heater, the yard lines, fixtures and the exclusions in rows. Gaps show up quickly. Ask each contractor how changes after rough-in are priced, how many inspection trips are included and who calls for inspections. A slightly higher bid that covers the whole house is often a better deal than a lean one that leaves half the scope open. Our own proposals for new construction plumbing are written stage by stage for exactly this reason.
Questions about plumbing bids in Lilburn
How are changes after rough-in usually priced?
That varies by contractor, which is why the bid should say. Common approaches are a set price per added fixture or a time-and-materials rate, sometimes with a minimum charge for each change. Whatever the method, get changes agreed in writing before the work happens, since moving a drain after inspection can also mean another inspection.
Does the plumbing subcontractor need its own permit in Lilburn?
Yes. The plumbing subcontractor holds a trade permit apart from the builder's, and its affidavit, with proof of a state trade license and a business license, has to be on file before work starts and at least a day before any inspection is requested. Confirm in the contract who prepares and files it.
Is it better to buy fixtures myself or through the plumber?
Either can work. Buying through the plumber puts one party in charge of correct parts and replacements; buying your own gives you more choice. If you supply them, provide model numbers before rough-in, have everything on site before trim-out, and check that valve bodies and trim come from the same manufacturer.
Send us your plans for a price